FGD520-1100 machine made for the company KING AGRO, now John Deere.
It is a Gantry milling machine of high speed of 5 axes, specifically designed for the manufacture of two barrales in carbon fiber for the agricultural sector.
The “X” axis has a wide path, however the “Y” axis to adapt to the size of the piece, is short. In addition, 2 bridges are incorporated creating 2 work zones allowing machining simultaneously, alternatively or even to complete area.